Technical Specifications for Self-Righting Delineator Post
| Self-Righting Delineator Post | |
|---|---|
| Dimensions |
|
| Material |
|
| Manufacturing Process | Blow moulding |
| Weight | 1.8 kg (Approx. weight. May vary due to manufacturing tolerances or recycled material content.) |
| Available Colours | White, yellow, green, red and blue (custom colours available on request) |
| Available Types of Reflective Sheeting |
|
| Self-Righting Delineator Post | ||
|---|---|---|
| Compliance | EN 12899-1 | |
| HS Code (Global) | 392690 | |
| HS Code (EU) | 3926909790 | |
| Country of Origin | China | |
| Self-Righting Delineator Post | ||
|---|---|---|
| Mounting Hardware | M12 threaded sleeve | |
| Self-Righting Delineator Post | ||
|---|---|---|
| MOQ | 1 x full container load, mixed items allowed | |
| Production Time | 20–25 days after deposit | |
| Warranty | 1 year against manufacturing defects | |
Key Features of Our Self-Righting Delineator Posts
Our self-righting delineator posts are designed to withstand everyday traffic contact and simplify on-site handling and maintenance.

Shape Memory
Made from LDPE and EVA, the flexible body returns to its upright position after bending in any direction.

Reinforced Base
Thicker walls at the base strengthen the lower body where impact creates the greatest stress, improving long-term durability.

Easy-Grip Handles
Two integrated side handles provide a secure grip for carrying, positioning and manually screwing the post into place.

EN 12899-1 Compliant
The post complies with EN 12899-1, with supporting compliance documentation available on request.
Fast Installation with Integrated Base Plate – No Fitting Key Needed
The galvanised steel base plate is secured inside the post. One person can use the two side handles to screw the post into the installed M12 threaded sleeve. No fitting key or additional tightening tool is required.
This screw-on system allows installation twice as fast as with a traditional delineator post. The handles make tightening straightforward while standing, without twisting the back during this step.
Installation Steps
Drill and clean the hole: Drill a hole to suit the supplied M12 threaded sleeve, then remove dust and drilling debris.
Secure the sleeve: Inject a suitable anchoring resin into the prepared hole and insert the M12 threaded sleeve. Allow the resin to cure fully before fitting the post.
Screw in the post: Align the post with the sleeve and turn it by hand using the two side handles until securely seated.

Available Colours of Our Self-Righting Flexible Posts
Available in white, green, yellow, red and blue, with custom colours available for bulk orders.
Colour requirements for public roads vary by country and application. Select the colour specified for the destination market and intended use.

Typical Applications
Our self-righting delineator posts reinforce continuous road markings and provide clear traffic guidance. Typical installation locations include:
- Traffic island approaches: Highlight marked approaches and guide vehicles around islands.
- Lane reduction areas: Reinforce markings where traffic merges into fewer lanes.
- Toll plazas: Define lanes leading towards toll booths.
- Car parks and private roads: Delineate vehicle routes and restricted areas.
- Industrial and logistics sites: Define routes around entrances and loading areas.

Compatible Delineator Post Base
For installations where ground drilling is not preferred, our surface-mounted base provides an alternative fixing method for the post.
| Picture | Model | Ideal For |
|---|---|---|
![]() | Bonds to the ground with adhesive and features an integrated M12 thread for screwing the post into place. | |
Frequently Asked Questions
How far apart should the posts be installed?
Spacing depends on the location and purpose of the installation. Approximately 0.5–1 m can be considered for closely spaced guidance on straight sections, but public-road layouts should follow the relevant road authority’s requirements.
Is the M12 threaded sleeve included?
Yes. Each post is supplied with an M12 threaded sleeve for ground installation.
Can it be installed on asphalt and concrete?
Yes. The post can be installed on both asphalt and concrete using the supplied M12 threaded sleeve. Prepare the fixing hole and secure the sleeve according to the surface and underlying substrate.
Do I need any tools to install the post?
You need tools to drill the hole for the M12 threaded sleeve. Once the sleeve is securely installed, screw the post into it by hand using the two side handles. No fitting key is required for this step.
Need Self-Righting Delineator Post for your project?
Send us your required quantities, colours, reflective sheeting, branding requirements and delivery country.
Our team will provide bulk pricing, MOQ, lead times, export packing details and applicable compliance documentation.
Factory-direct pricing
Your logo, colours and packaging
Free product design support






