Product Video
Discover our product video to get a clear view of the product, its design, finishing and key features.
Technical Specifications for HGV Wheel Stop
| HGV Wheel Stop | |
|---|---|
| Dimensions |
|
| Material | Plastic-Rubber composite |
| Weight | 21 kg (Approx. weight. May vary due to manufacturing tolerances or recycled material content.) |
| HGV Wheel Stop | ||
|---|---|---|
| Compliance | REACH compliant | |
| HS Code (Global) | 392690 | |
| HS Code (EU) | 3926909790 | |
| Country of Origin | China | |
| HGV Wheel Stop | |
|---|---|
| Packing | Plywood pallet |
| Quantity per Packing Unit | 30 pieces |
| Packing Unit Size | 1100 × 1100 × 1100 mm |
| Packing Unit Weight | 635 kg |
| HGV Wheel Stop | ||
|---|---|---|
| Mounting Hardware | Hot-dip galvanised hex flange coach screws & plastic anchors (polyethylene) | |
| HGV Wheel Stop | ||
|---|---|---|
| MOQ | 1 x full container load, mixed items allowed | |
| Production Time | 20–25 days after deposit | |
| Warranty | 1 year against manufacturing defects | |
HGV Wheel Stops for Truck Bays and Loading Areas
The HGV wheel stop is designed for parking and positioning of heavy goods vehicles, including lorries and articulated vehicles. Manufactured from durable plastic-rubber composite, it meets REACH regulations for supply into the European market.
This model provides a stable stopping point for heavy vehicles. Its full-contact design spreads the impact evenly, which helps protect both the wheel stop and the ground surface from damage.

Typical Applications of Lorry Wheel Stops
This lorry wheel stop is suitable for use in:
- Logistics centres and distribution hubs
- Industrial warehouses and loading bays
- Truck parking bays and service yards
- Transport depots and freight terminals
- Ports and ferry terminals

Related Wheel Stop Models
For passenger vehicle parking and mixed-use sites, we also supply:
| Picture | Model | Ideal For |
|---|---|---|
![]() | For standard car parking bays | |
![]() | For bus and coach parking areas | |
All models are manufactured from plastic-rubber composite and comply with REACH regulations. For project-scale orders, reflective colours and logo branding can be customised to match your specifications.
Truck Wheel Stop Supply Information
Specification sheets, MOQ details, and export packing information for truck wheel stops are available on request. Bulk supply is supported for UK and European distribution projects.










